One frequently overlooked area in planning is technical
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.

A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.

Technical reviews and inspections are two areas which are often looked over.

Alternativas
Comentários
  • O texto diz: "One frequently overlooked area in planning is technicalreviews and inspections."Então, "Technical reviews and inspections" is one area.Ou seja, revisões técnicas e inspeções fazem parte de uma área e não de duas como diz a questão...
  • No texto afirma que as área em questão são negligenciadas (overlooked) e na questão diz que as áreas são frequentemente olhadas/consideradas (looked over. Portanto a questão afirma o contrário do que o texto está afirmando.
  • e-

    look over - examine, inspect

    overlook - ignore.