     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

According to the article, 2014 has been the fourth year of

Alternativas

ID
3856297
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

As to the bus and rail systems being built for this year’s World Cup, the text states that they will

Alternativas

ID
3856300
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

Gil Castelo Branco points to the shocking reality of huge resources being wasted on extravagant projects as opposed to

Alternativas

ID
3856303
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

According to the article, Brazil’s not being able to complete huge infrastructure projects shows that

Alternativas

ID
3856306
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

According to an economist, Mr. Lazzarini, the cruel reality in Brazil is that

Alternativas
Comentários
  • "The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.”

    Por este trecho percebe-se que o real crisis é que o estado corre riscos de ruínas em projetos de infraestrutura criados por ele mesmo

    Letra B)


ID
3856309
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

Among the reasons given by César Borges as justification for the delay in completing the Transnordestina was the

Alternativas

ID
3856312
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

In the long list of unfinished projects the text includes

Alternativas

ID
3856315
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

According to the text, manufacturers are worried about having to deal with

Alternativas

ID
3856318
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

People supporting the government of President Dilma Rousseff argue that the spending of public money in infrastructure projects has contributed to

Alternativas

ID
3856321
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

For some economists, the wasteful spending in the troublesome projects throughout the country unveils, among other aspects, questions related to

Alternativas

ID
3856324
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

The –ING words in “withering criticism”, “wasteful spending” and “daunting task” are, respectively,

Alternativas

ID
3856327
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

In terms of tenses, the verbs in “…investors have grown…”, “…he acknowledged…” and “were intended” are, respectively, in the

Alternativas

ID
3856330
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

Choose the alternative that contains only irregular verbs.

Alternativas

ID
3856333
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

In the sentence “…the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption”, one finds a/an

Alternativas

ID
3856336
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

The sentence “…immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets” contains a/an

Alternativas

ID
3856339
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

In terms of voice, the verbs in the sentences “Huge street protests have been aimed at costly new stadiums” and “The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil” are, respectively

Alternativas
Comentários
  • Não me caro, ngm vai te esclarecer, por um motivo: não tem como justificar essa alternativa como errada.

  • Assinalei essa mesmo a alternativa a) sendo atentadora, simplesmente, porque, causa de diminuição é uma coisa e LIMITE é outra, isso me parece óbvio, mas a banca não pediu a correta e sim aquela que assinala a crítica doutrinária...

    Enfim, a alternativa está correta, contudo o comando da questão quer que se assinale àquela que representa a discussão no cenário penal brasileiro na doutrina, que nada mais é, se não, a responsabilidade objetiva das ações livres na causa.


ID
3856342
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

The two sentences “‘Some ventures never deserved public money in the first place,’ said Sérgio Lazzarini, an economist at Insper, a São Paulo business school” and “‘That museum,’ said Roberto Macedo, an economist at the University of São Paulo, ‘is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver’” contain, respectively, examples of

Alternativas

ID
3856345
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

The sentences “Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer.” and “While an economic crisis here still seems like a remote possibility, investors have grown increasingly pessimistic” contain, respectively,

Alternativas
Comentários
  • Por que seria essa resposta ? Pode tirar minha dúvida?

  • But é coordinating conjunction

    Still é subordinating conjunction


ID
3856348
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

The sentences “Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys” and “It is building bus and rail systems for spectators that will not be finished until long after the games are done” contain, respectively, relative pronouns that introduce a

Alternativas

ID
3856351
Banca
UECE-CEV
Órgão
UECE
Ano
2014
Provas
Disciplina
Inglês
Assuntos

     Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
     As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
    Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
    Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
   “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
     The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
     Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
     President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
    Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
     “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
     The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
     Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
    Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
     Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

Adapted from www.nytimes.com/April 12, 2014.

In the sentence “That museum… is an insult to both extraterrestrials and the terrestrial beings like ourselves…”, one finds a/an